CONSULTANT:
CONTRACT SCOPE OF WORK:
1. SUPPLY, FABRICATION, PAINTING AND ERECTION OF STRUCTURE STEEL
2. SUPPLY , FABRICATION ERECTION OF GRATING
3. SUPPLY, FABRICATION AND ERECTION OF CS PIPE FOR CHIMNEY
4. SUPPLY FLANGED 48 INCH
5. DISMANTLING OLD STRUCTURE STEEL , GRATING AND OLD CHIMNEY
6. DISMANTLING TWO FILTER EBF CYLINDERS , AIR LOCK , BUTTER FLY VALVE AND AIR TANK
7. ERECTION NEW FILTER EPF CYLINDERS WITH BIG CRANE 200 TON
8. ERECTION NEW CHIMNEY , STRUCTURE STEEL AND GRATING
9. CONNECTION PIPE LINE WITH FILTERS AND BUTTERFLY VALVE, AIR LOCK AND AIR TANK