CONTRACT SCOPE OF WORK:

 

STEEL STRUCTURE

COMPLETE SUPPLY, FABRICATION, SAND BLASTING, PAINTING AND ERECTION OF STEEL STRUCTURE FOR REACTOR AREA AND BAG FILTER AREA APPROXIMATELY 525 TON

TURBINE GENERATOR MECHANICAL :

ERECTION ADJUSTMENT, LEVELING , ALIGNMENT, TESTING & COMMISSIONING OF 13MW TURBINE GENERATOR WITH ALL ACCESSORIES INCLUDE TURBINE, GEARBOX, GENERATOR, OIL SYSTEM, CONDENSER, CONDENSATE SYSTEM ( PUMP, PIPES, VALVES) COOLING SYSTEM, STEAM SYSTEM CONNECTED TO THE TURBINE BATTERY LIMIT AND REQUIRED ACTIVITIES FOR THE EQUIPMENT TO START UP AND CLEANING , FLUSHING THE PIPE FOR START UP APPROXIMATELY 121 TONS.

 

 DRYER FIRE BOX SHELL LINE III

COMPLETE SUPPLY, ROLLING , FABRICATION, SAND BLASTING, PAINTING AND  ERECTION OF DRYER FIRE BOX LINE III APPROXIMATELY  25 TONS AND DISMANTLING OLD DRYER FIRE BOX REMOVAL OF NECESSARY STRUCTURE RE-ERECT AND COMPLETE CONNECTION WITH PIPE WORK APPROXIMATELY 63 TONS.

 

 

DRYER FIRE BOX SHELL LINE V

 COMPLETE SUPPLY, ROLLING, FABRICATION, SAND BLASTING, PAINTING AND ERECTION OF DRYER FIRE BOX LINE V APPROXIMATELY 79 TONS.

STAINLESS STEEL PIPES DUCT

COMPLETE ROLLING AND FABRICATION OF DUCTING FROM PLEATS STAINLESS STEEL  304 H , 316L AND 3CR12  8 MM THICKNESS APPROXIMATELY QTY. 125 TONS.

 GRATING

COMPLETE SUPPLY FABRICATION AND ERECTION OF GRATING APPROXIMATELY 50 TONS

PIPE WORKS

COMPLETE FABRICATION ERECTION CARBON STEEL AND STAINLESS STEEL PIPE WORK FROM ½” UP TO 70” INCLUDE MITER BENDS, REDUCERS, FLANGES, LINER, SUPPORTS AND VALVES AND ALL NECESSARY APPROXIMATELY 240 TONS.